Retour à Solutions

Scènes espaces publics

Modèles de scène lobby, couloir et back-of-house pour projets hôtellerie.

  • 4 zonesTypical public areas
    lobby · corridor · meeting · back-of-house
  • 24hDaily schedule
    base + occupancy overlay
  • Same SKUsHardware reuse
    same modules as guestrooms
  • LocalRCU execution
    schedule survives offline

* Tables below are engineering convention examples; holiday, banquet et DST adjustments go into contract scene-table version — confirm per property measurement.

Public-area daily schedule execution

Public-area daily schedule

Cite directly dans tender docs — lighting, HVAC et scene outputs by time slot;base schedule + PIR ou overlayis public-area engineering convention.

TimeLobbyCorridor / stairsMeeting roomRetour-of-house
00:00–06:00Stetby low 30%PIR OFF · safety base 10%All off · pre-cool OFFPIR + base light
06:00–08:00Bienvenue 80%· FCU presetPIR fill 50%Pre-set 1h before booking (optional)Full base on
08:00–18:00Open 100%· daylight compensationPIR + 5 min delayPer booking · projection scenePIR 70%
18:00–22:00Ambient 60%· accent washPIR + 3 min delayPer session · discuss/projectPIR 50%
22:00–24:00Stetby 40%PIR OFF · base 15%All off · vent delayBase + PIR

Four-zone engineering notes

BOM differences by zone — same module SKUs as guestrooms, different circuits et schedules.

Reception lobby

Multi-circuit lighting + wash/chetelier groups;FCU modulewelcome preset; daylight compensation.

Corridor / stairs

PIR+ timed base; aligned avecguestroom energycorridor policy; may use separate enclosure.

Retour-of-house / linen

Long base + PIR; same bus as public RCU ou sub-enclosure; spare parts unified avec guestrooms.

Restaurant / all-day dining

Meal-period scenes (breakfast/lunch/dinner); dimming + schedule — seehospitality venues.

Gym / SPA

Open-hours schedule + PIR floor; optional humidity/temp sensors sur RCU DI.

Public vs guestroom · control differences

ItemPublicChambre d’hôtel
Primary triggerSchedule + PIR fillCarte énergie+ scene keys
Typical modulesRelay/dim + PIRCarte énergie + panel + FCU
ExecutionRCU local scheduleRCU scene table
Platform dependencyBooking/event table (optional)PMS room state (optional)
Offline behaviorKeep schedule + PIRKeep scenes + card-power logic

Office · guestroom hardware reuse

Public-area hardware topology

Hardware layer · same modules

Public et guestrooms may use separate enclosures; Bus RS485 may interconnect — fewer spare SKUs et simpler maintenance.

All products →
Optionnel booking linkage

Platform layer · booking linkage (optional)

Meeting booking, banquet events, group schedule push by integrator BMS/meeting system — Point Pur Intelligent providesprotocol mappinget DI/Modbus docs.

  • Nont a Point Pur Intelligent SaaS core product
  • RCU runs local day schedule when offline
  • Event days allow manual panel override
API développeur →

Hardware topology reference

Public schedule topology
Schedule + sensors → RCU scene engine → public relay circuits; booking/event via integrator platform (optional). Tender docs may cite this diagram +commercial office reference.

Acceptance checklist

Schedule switch

Simulate 06:00 / 22:00 boundaries; measure lobby et corridor levels.

PIR overlay

Corridor lights sur when occupied, off after delay; no conflict avec base schedule.

Meeting scenes

Project/discuss/all-off keys; curtain et lighting linked.

Offline keep-alive

Disconnect host; RCU still runs local day schedule.

Modèles recommandés