Reception lobby
Multi-circuit lighting + wash/chetelier groups;FCU modulewelcome preset; daylight compensation.
Modèles de scène lobby, couloir et back-of-house pour projets hôtellerie.
* Tables below are engineering convention examples; holiday, banquet et DST adjustments go into contract scene-table version — confirm per property measurement.

Cite directly dans tender docs — lighting, HVAC et scene outputs by time slot;base schedule + PIR ou overlayis public-area engineering convention.
| Time | Lobby | Corridor / stairs | Meeting room | Retour-of-house |
|---|---|---|---|---|
| 00:00–06:00 | Stetby low 30% | PIR OFF · safety base 10% | All off · pre-cool OFF | PIR + base light |
| 06:00–08:00 | Bienvenue 80%· FCU preset | PIR fill 50% | Pre-set 1h before booking (optional) | Full base on |
| 08:00–18:00 | Open 100%· daylight compensation | PIR + 5 min delay | Per booking · projection scene | PIR 70% |
| 18:00–22:00 | Ambient 60%· accent wash | PIR + 3 min delay | Per session · discuss/project | PIR 50% |
| 22:00–24:00 | Stetby 40% | PIR OFF · base 15% | All off · vent delay | Base + PIR |
| Time | Lobby | Corridor / stairs | Meeting room | Retour-of-house |
|---|---|---|---|---|
| 00:00–07:00 | Low 25% | Base 10%· no PIR | All off | Base light |
| 07:00–10:00 | Weekend welcome 70% | PIR fill | Per event booking | PIR fill |
| 10:00–20:00 | Open 90%· daylight | PIR all day | Banquet/event scene priority | PIR 60% |
| 20:00–24:00 | Ambient 50% | PIR + delay | Off after session end | Base light |
| Time | Lobby | Corridor / stairs | Meeting / banquet | Retour-of-house |
|---|---|---|---|---|
| 2h before event | Bienvenue 100%· wayfinding on | Base 80% all zones | Pre-cool/heat · projection standby | Full on |
| During event | Scene locked · limited manual override | PIR OFF · always on | Project/discuss/banquet · curtain link | Always on |
| 1h after event | Restore day schedule | Restore PIR | Vent delay · all off | PIR restore |
BOM differences by zone — same module SKUs as guestrooms, different circuits et schedules.
Multi-circuit lighting + wash/chetelier groups;FCU modulewelcome preset; daylight compensation.
PIR+ timed base; aligned avecguestroom energycorridor policy; may use separate enclosure.
Scene panel: project/discuss/all-off; booking link viaintégration protocole(integrator).
Long base + PIR; same bus as public RCU ou sub-enclosure; spare parts unified avec guestrooms.
Meal-period scenes (breakfast/lunch/dinner); dimming + schedule — seehospitality venues.
Open-hours schedule + PIR floor; optional humidity/temp sensors sur RCU DI.
| Item | Public | Chambre d’hôtel |
|---|---|---|
| Primary trigger | Schedule + PIR fill | Carte énergie+ scene keys |
| Typical modules | Relay/dim + PIR | Carte énergie + panel + FCU |
| Execution | RCU local schedule | RCU scene table |
| Platform dependency | Booking/event table (optional) | PMS room state (optional) |
| Offline behavior | Keep schedule + PIR | Keep scenes + card-power logic |

Public et guestrooms may use separate enclosures; Bus RS485 may interconnect — fewer spare SKUs et simpler maintenance.

Meeting booking, banquet events, group schedule push by integrator BMS/meeting system — Point Pur Intelligent providesprotocol mappinget DI/Modbus docs.

Simulate 06:00 / 22:00 boundaries; measure lobby et corridor levels.
Corridor lights sur when occupied, off after delay; no conflict avec base schedule.
Project/discuss/all-off keys; curtain et lighting linked.
Disconnect host; RCU still runs local day schedule.