Back to Solutions

Hospitality venues

Restaurants, clubs and venue lighting and scene control references.

Engineering Reference · Hospitality Venues

Four daypart lighting scenes—preset in panels and modules, not ops back office

Hospitality venue engineering focuses onprep → lunch → dinner → closelighting scene switching and private-room / bar independent circuits. PurePoint Smart deliversscene panels, relays, and dimming modules; kitchen exhaust ventilation is professional HVAC; multi-store BOM cloning atChain reference.

  • 4 daypartsDaily scenes
    prep to close
  • 3 moodsLunch/dinner/bar
    ambience
  • ZonesMain hall private rooms
    kitchen independent
  • ChainMulti-store BOM
    unified panels

* Four daypart schedules and scene semantics written to local RCU; chain projects should bind BOM version and panel silkscreen.

Zoned hardware · BOM comparison

Hospitality venues usemain hall / private room / kitchen / barzones—not guestroom six-point BOM. Conventional engineering combos below; SKUs in product catalog.

ZoneCore hardwareFour dayparts linkCapability / product
Main hallScene panel + relay + dimmingLunch bright / dinner warm / close cleaningScene lighting·Smart switches
Private roomIndependent scene keys · curtains (optional)Banquet / business / vacate resetMulti-key panels·Curtains
KitchenThree-key panel + relayOperation / cleaning / standbyRelay modules
BarIndependent circuit · low-level dimmingIsolated from main hall—prevent whole-venue dim by mistakeDimming modules

Bid preparation · three recommendations

Hospitality bids should specify schedules and acceptance illuminance—not device counts alone.

① Set four daypart schedule

06:00 / 11:30 / 18:00 / 22:00 boundaries and zone illuminance in technical deviation table.

② Draw independent circuits

Private rooms, bar must not false-link with main hall; kitchen isolated from front-of-house.

③ Chain clone

Panel silkscreen and scene semantics ship with v2.x BOM—new stores accept per checklist.

Four dayparts (click to switch)

Prep daypart · scene output

  • Main hallBaseline 60%, decorative OFF
  • KitchenOperation full 100%, exhaust linkage (optional)
  • Private roomStandby low, booking preset available
  • HVACPre-cool / pre-heat, non-FOH zones capped

Ambience lighting · three moods (Loxone-style)

Same space, different color temperature and illuminance layers by daypart—click "Lunch / Dinner / Close" above to highlight matching mood.

Lunch bright

Lunch · bright

High CRI, even illuminance—fast casual and business lunch

Dinner warm

Dinner · warm

Main down, decorative and table light accent

Bar low level

Bar · low level

Bar accent light, independent from main hall—prevent whole-venue dim

Front-line use · scene panels

Hospitality venue scene panel
  • Main hallLunch / dinner / cleaning
  • Private roomBanquet / business / vacate reset
  • KitchenOperation / cleaning / standby (exhaust linkage optional)
  • ChainUnified panel style and BOM across stores →Chain BOM reference

Kitchen ventilation · scope boundary

Grease exhaust is professional HVAC; PurePoint Smart delivers kitchen lighting zones, close linkage, and visible energy—detailed ventilation from integrator or HVAC partner documentation.

Acceptance checklist

Four daypart switch

Simulate 06:00 / 11:30 / 18:00 / 22:00 boundaries—measure main hall and private room illuminance change.

Private room independent

Banquet scene must not dim entire main hall; vacate reset delay correct.

Kitchen zoned

Operation/cleaning/standby three keys; non-essential circuits off after close.

Chain consistency

Panel silkscreen and scene semantics match contract BOM version.

Engineering reference (7 topics)

→ Standard guestroom master solution