Back to Solutions

Industrial park

Multi-building RS485 expansion, gate sensors and public-area relays for campus projects.

Engineering Reference · Industrial Park

Campus projects: multi-building hardware points, one module family

Industrial parks spanfactory, warehouse, roads, gatehousepoint types—extend RS485 bus with the samerelay modules, switch panels, sensorsas hotel to reduce stocking variety. Tenant move-in/out permissions and metering are integrator platforms; PurePoint Smart extends fromCommercial office hardware referenceand public-area capability.

  • 4 zonesFactory warehouse
    gate road
  • 4 stagesTenant lifecycle
    lease to exit
  • RS485Multi-building
    same modules
  • Sub-meterBuilding metering
    integrator

* Production-line PLC and chiller BMS are delivered by professional integrators; PurePoint Smart covers lighting, gatehouse sensors, and public-area relay nodes.

Four-zone hardware · BOM comparison

Campus points byfactory / warehouse / support / gatehouse—same RS485 module family extension to reduce stocking variety.

ZoneTypical sceneCore hardwareSolution / product
A· FactoryShift lighting · PIR zonesRS485 relay + PIRRelay modules·RS485
B· WarehouseCorridor sensor · loading ops8-channel relay + door contactSensors·Public areas
C· Support buildingOffice · canteenRCU gateway + scene panelsCommercial offices·Hospitality venues
Gatehouse / roadsBarrier DI · night dimGatehouse sensor + scheduleSecurity

Acceptance checklist

Bus addresses

Multi-building RS485 address plan finalized once—no on-site ad-hoc changes; attach versioned drawing set.

Zone independence

Factory shift switch does not affect warehouse corridors; gatehouse alarm DI testable.

Tenant boundary

Metering module ownership at lease signing; baseline archived for next tenant reuse.

Multi-park clone

BOM and checklist clone per chain standard, seeChain solution.

Bid preparation · three recommendations

① Draw campus topology

Four-zone partition and RS485 backbone planned once—attach multi-building address allocation table.

② Set tenant lifecycle

Lease→production→oversight→exit four-stage hardware boundary and metering module ownership.

③ Draw trade boundaries

Production PLC / chiller BMS labeled integrator; PurePoint Smart delivers lighting and gatehouse nodes.

Campus topology (click zones)

Multi-building BMS integration narrative—click map pins or legend to switch zone detail; hardware SKUs extend hotel public-area family.

Industrial park campus aerial illustration

Production factory · shift lighting

  • Morning shift06:00 operation zone full · office 80%
  • Mid shiftPIR zones · empty areas 50%
  • Night shiftCorridor hold 30%· line accent
  • HardwareRS485 relay +PIR sensors

Tenant lifecycle · four stages

Campus difference is tenant move-in/out—hardware boundary and metering modules set at lease; software logic by integrator.

1

Lease start

Define building/floor metering boundary, scene template archived

2

Fit-out & production

Flagship point acceptance, sub-meters online

3

Operations oversight

Alerts / energy benchmark, flag outlier buildings

4

Exit recovery

Permissions off, baseline archived for next tenant

Fragmented build vs campus platform

Each on their own

  • Each tenant retrofits independently—property only has master meters
  • Road lighting and factory systems unlinked

PurePoint Smart campus route

  • Property-led standard hardware BOM + tenant optional sub-meter modules
  • Public-area schedule relays + gatehouse sensor hardware linkage
  • Multi-park standard list clone →Chain BOM reference

Recommended hardware kit

Engineering reference (7 topics)

→ Standard guestroom master solution