Hotel smart modules

Floor heating control module

Relay, DI/DO and expansion modules for RS485 and wireless guestroom buses.

Floor heating control module

Floor heating control module — Floor heating control for guestroom heating scenes. Floor heating control module with RCU scene linkage; heating BOM item for northern-climate hotels.

  • Floor heating
  • valve control
  • RS485
  • Floor heating control
  • Heating scene linkage
  • RCU integration
  • Northern-climate hotels
Floor heating Floor heating/hydronic control module
RS485 bus Modbus RTU · with RCU networking
Installation DIN rail / low-voltage cabinet
Load confirm model selection per project
Application hotel guestroom · building public areas · centralized control
Product
HVAC control module
Series
HVAC gateway module
Features
floor heating · valve control · RS485
Interfaces
RS485 bus · Modbus RTU (model-dependent)

Specifications

Parameter Specification
Product name HVAC control module
Product series HVAC control module
Key features floor heating · valve control · RS485· FCU/VRF/floor heating · RS485 bus · protocol conversion
Product overview HVAC control module — Floor heating control for guestroom heating scenes. RS485 bus actuator, DIN-rail mount, pairs with hotel RCU host.
Installation 86 mm back box / standard wall / LV cabinet (model-dependent)
Communication method RS485 bus · Modbus RTU (model-dependent)
Delivery Bulk project supply · finish and load per BOM
Applications Hotel guestroom · building public areas · bulk projects
Engineering sup port Detailed design docs · project BOM · bulk supply coordination

Wiring diagram

HVAC module engineering wiring reference — FCU/VRF/floor heating protocol and equipment integration. Per signed drawing set.

Floor heating/hydronic control module wiring diagram
Floor heating/hydronic control module · RS485 → HVAC protocol → FCU/VRF

Installation notes

  • module address must be at detailed design phase with RCU circuit schedule, scene schedule planned together
  • DIN rail/low-voltage cabinet installation must reserved cooling space, terminals torque per factory specification
  • Wire per project drawing; signed projects use factory shipment drawings
  • after power-on with RCU commissioning: output actions, bus communication, scene linkage item-by-item acceptance
  • HVAC protocol and address table must sync with HVAC construction drawings during detailed design
Need floor heating/hydronic control module selection and HVAC protocol integration? Contact the team for protocol mapping table, HVAC brand integration and detailed design reference.