Hotel smart switch panels

Guestroom main light switch

Hotel smart switch panels for guestroom lighting, scene keys and glass touch on RS485 — OEM/ODM Guangzhou since 1996.

Guestroom main light switch

Guestroom main light switch — Main and vanity lighting zones with backlight; RCU welcome and sleep scenes.This page lists finish options; specify the finish code when ordering. Single-zone main light for economy standard rooms; spec in the same RS485/RCU family as multi-gang lighting panels.

  • RS485
  • Touch
  • Backlight
  • Single-zone main light
  • Economy standard room
  • RS485 bus to RCU
  • Same panel family BOM
86 mm back box Standard wall mount, compatible with project back boxes
RS485 bus with RCU host, smart module networking
Glass touch Tempered glass panel with backlight status indication
6 finish options A / E / F / G / H / I engineering optional
output guestroom main light, mood light independent circuit control
Installation
Smart light switch
Panel
Tempered glass touch
Communication
RS485 bus
Circuits
1-gang lighting
Indication
Backlight status
Finish
6 options available
Delivery
Bulk project supply
Series
1G–8G series

Specifications

Parameter Specification
Product name Smart light switch
Installation 86 mm back box · standard wall
Panel material Tempered glass touch · metal/glass multi-finish
Control circuits Smart light switch — Main and vanity lighting zones with backlight; RCU welcome and sleep scenes. Tempered glass touch, RS485 bus, pairs with hotel RCU host.
Communication method RS485 bus · network with RCU/modules
Status indication backlight indication · switch statusvisible
Optional finishes A / E / F / G / H / I (see gallery above)
Delivery bulk project supply · finishper BOM noted
Applications Hotel guestroom · building public areas · bulk projects

Wiring diagram

lighting panel category general-purpose wiring reference — specific terminals wire gauge per signed version wiring atlas as reference.

smart lighting switch wiring diagram
smart lighting switch · RS485 bus → RCU mapping

Installation notes

  • Lighting panel circuit schedule must be planned with RCU addresses during detailed design
  • Reserve 10% circuit margin per room for future additions
  • Wire per project drawing; signed projects use factory shipment drawings
  • after power-on with RCU commissioning: touch, scene, backlight indication item-by-item acceptance
Need Lighting panel selection and circuit planning? Contact the team for finish list, project BOM and standard room detailed design reference.