Hotel smart switch panels

Suite multi-zone lighting switch

Hotel smart switch panels for guestroom lighting, scene keys and glass touch on RS485 — OEM/ODM Guangzhou since 1996.

Suite multi-zone lighting switch

Suite multi-zone lighting switch — Multi-zone suite lighting; scene presets managed by RCU host.This page lists finish options; specify the finish code when ordering. Six-gang lighting for premium suites and multi-scene guestrooms; spec with light-4g/8g in the same integrator BOM.

  • RS485
  • Touch
  • Backlight
  • 6-gang zoned lighting
  • Multi-scene suite presets
  • RS485 bus to RCU
  • BOM family with 4g/8g panels
86 mm back box Standard wall mount, compatible with project back boxes
RS485 bus with RCU host, smart module networking
Glass touch Tempered glass panel with backlight status indication
6 finish options A / D / E / F / G / I
6-gang output Suite multi-lamp independent circuit control
Installation
Smart light switch
Panel
Tempered glass touch
Communication
RS485 bus
Circuits
6-gang lighting
Indication
Backlight status
Finish
6 options available
Delivery
Bulk project supply
Series
1G–8G series

Specifications

Parameter Specification
Product name Smart light switch
Installation 86 mm back box
Panel material Tempered glass touch
Control circuits Smart light switch — Multi-zone suite lighting; scene presets managed by RCU host. Tempered glass touch, RS485 bus, pairs with hotel RCU host.
Communication method RS485 bus
Status indication Backlight status
Optional finishes A / D / E / F / G / I (see gallery above)
Product series 1G–8G series
Delivery Bulk project supply

Wiring diagram

lighting panel category general-purpose wiring reference — specific terminals wire gauge per signed version wiring atlas as reference.

smart lighting switch wiring diagram
smart lighting switch · RS485 bus → RCU mapping

Installation notes

  • Lighting panel circuit schedule must be planned with RCU addresses during detailed design
  • Reserve 10% circuit margin per room for future additions
  • Wire per project drawing; signed projects use factory shipment drawings
  • after power-on with RCU commissioning: touch, scene, backlight indication item-by-item acceptance
requires6-gang lighting switchselection and circuitplanning? Contact the team for finish list, project BOM and standard room detailed design reference.